Changes between Version 32 and Version 33 of IIRS/DevelopmentPlan


Ignore:
Timestamp:
09/04/13 14:31:37 (3 years ago)
Author:
jim
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IIRS/DevelopmentPlan

    v32 v33  
    5050    * '''Elements''' = a chunk of widget that will be delivered by the framework -- the bits  a widget is built from with the framework... We need: Container (shows a panels display in iFrame), Modal-container (shows panels display iFrame in popup), Button, Link... More can be added as needed and provided by other modules etc. 
    5151    * '''Workflow''' = A means of linking displays (pages) and processes within the widget together. 
     52  * http://drupal.org/project/widgets is no use at all -- good module for in Drupal site widgets, not for generating/rendering those outside. 
     53* Email regarding integration with incumbent/existing sites (0.25 hours) 
    5254 
    53  
    54   * http://drupal.org/project/widgets is no use at all -- good module for in Drupal site widgets, not for generating/rendering those outside. 
     55==== 4 September -- 1.5h (+16.25) ==== 
     56* Development Work to create plugins and framework using panels/ctools as base (1 hour) 
     57* Skype with Ed regarding progress and plans (0.5 hours) 
    5558 
    5659 
     
    6063* UNDERWAY Resolve tension/shortcoming in nested Drush Makefiles causing module dupes between /profiles/modules and /sites/all/modules - https://drupal.org/node/1006620  
    6164 
    62 '''Development total so far: 12.25 hours''' 
    6365 
    6466